eiai Studio
Construction company websiteA page for each development
Plan a construction company website for a Batumi developer. Tie floor plans to buildings and distinguish dated site photographs from architectural renders.
Worked example
Two buildings in progress
We have two buildings in Batumi. Give each a page. Label the renders, date the site photographs and identify the building on each floor plan.
Which building and floor does the supplied plan belong to?
Two buildings in progress
Building progress
See the most recent dated photograph and open a floor plan for this building.
The reader
Where does a buyer start?
Two neighbouring buildings in Batumi can share a sales office yet be at different stages of construction. Put each development’s name, location and current stage on the overview. Someone opening a card should recognise the same building by its name and address. Label the construction site and sales office separately, particularly if they are on different streets.
For the first page, choose a building for which the sales team has a complete set of material. Get the current description from the project lead and ask the person responsible for the plans which version you can publish. You do not need a whole folder of internal working files. One approved plan, a dated photograph and a few agreed sentences show what belongs on every project page and what is specific to this building.
Page content
What does the photograph show today?
An architectural render shows a design. A site photograph records a particular moment. Label each beside the image so a reader on a phone can tell them apart. Give the month of the photograph and identify the building in the photo. Try taking the next progress picture from the same position. For stages not yet built, use wording the project team has confirmed.
When adding a picture, read the old description too. Last month’s note on the foundations can still be useful as a record, but without its date it reads like current news. Keep the latest confirmed stage near the top and arrange earlier pictures by date below it. A short caption can be enough if it explains what changed and the sales team knows who supplied the information.
In practice
Match each plan to its building and floor
If both buildings have a similar flat, room count alone will not identify the plan. Label the building, floor and flat type, and say whether the area is in square metres. Where you supply both an illustration and a downloadable drawing, check both revisions. Repeat the project reference beside the sales contact so a buyer can ask about the exact plan they were viewing.
Test the floor plan as a buyer might use it after a meeting. They may save only the image and ring a few days later. A building name and floor in the drawing heading help both of you discuss the same plan. Repeat details as text if the drawing’s labels are too small on a phone. Check with its owner what the floor area includes, particularly where the balcony has a separate measurement.
Live preview
Can a buyer find the right floor plan?
Give the AI website builder the material for one building first. In the live preview, go from the overview to a particular floor. Then try a direct project link as a person receiving it from a sales representative for the first time. That reader still needs to identify the building, its progress and the right contact. Check that returning to the list does not lead them back into a plan for the neighbouring building.
Before adding the next building, write down what needs changing and how you will check the result. Begin with the name and address and finish by matching drawings. For a larger change the AI website builder can propose a plan. Review it, and tell the AI website builder the next page may reuse the same structure. Get each building’s photographs, plans and dates from the person who keeps its records.
Use one building’s records to brief the project page. For the developer’s introduction, see the business website guide.
FAQ
Where should completed developments appear?
Group them separately from buildings under construction. Include the completion date and your own photograph of the finished building. If the page becomes part of a portfolio, revisit old sales wording. Words like “now” or “soon” can be misleading years later. Give the date and describe the completed work.
Which date belongs under a progress photograph?
Use the date it was taken. That can differ from the day you updated the page, so label both dates if you show them together. If one visit covers several buildings, name the building on each picture straight away. The date alone cannot identify which building was photographed.
Can I start with just one building?
Yes. Choose one with verified plans, images and progress information. Add the others as their material becomes available. Test the page against a question the sales office regularly hears. That shows what to gather for the next building, and who can check it.
How should a revised plan be labelled?
Use the revision or date supplied by the project team. Check the rest of the page for copies of the superseded drawing. Open the link the sales representative sends after meetings too. A correct picture on the site and an old attachment in a message leave the buyer with conflicting details.
Plan your first development page
Start with one approved floor plan and a dated progress photograph.
How eiai Studio works